Saturday, September 08, 2007




GOODY HILL
Even though it’s Saturday they were here as promised. It took hardly any time at all for the bobcat driver to spread 8 truckloads of sand down Bahia.
Let me assure you that the shoreline will not be that wide! A lot more sand is coming in and when they finish delivering and spreading, then an excavator will arrive to restore the eroded banks up to the asphalt. They then will cut in while creating an elevated slope to the water's edge. Wave action can then move gently instead of having a raw place to erode.
Isn't this exciting! Thank you Goody Hill!

0 Comments:

Post a Comment

<< Home